Production Facility Upgrade
Home Our Projects production facility upgrade Liquid Confectionary – Zooper Dooper production facility upgrade (Lion – Dairy and Drinks) Project budget: $20mil +Project duration: 5yrsProduction area: 2,000 sqm Realise Engineering provided the concept to completion services for the project. This included the following engineering services: initial conceptual layout design, technical investigation and scenario planning, supplier […]
Pharmaceutical Logistics Automation Installation

Home Our Projects Pharmaceutical Logistics Automation Installation Pharmaceutical Logistics Automation Installation Client Symbion Location Western Sydney Project budget $45 million+ Project duration 2 years Symbion engaged Realise Engineering to oversee the complete project management and coordination of a state-of-the-art pharmaceutical distribution centre in Western Sydney. The project centred around integrating an advanced automated storage and […]
Soundproof Enclosure for Cut-Off Saw

Home Our Projects Soundproof Enclosure for Cut-Off Saw Soundproof Enclosure for Cut-Off Saw Client Weldlok Location Sydney Project budget N/A Project duration 3 months Weldlok, a major supplier of industrial handrails and steel grids, required a custom-designed soundproof enclosure to reduce noise emissions from one of their cut-off saws by a minimum of 25dB. The […]
Cleanroom Facility Upgrade
Home Our Projects Cleanroom facility upgrade Effervescent conditions cleanroom facility upgrade Project Budget: $2millProject Duration: 5 months Realise Engineering Design, Project Management and coordination for the upgrade of a cleanroom for a contract manufacturing pharmaceutical company. Realise Engineering was engaged by a manufacturing company, specializing in pharmaceutical products, to assist with the design and project […]
Structural Design – Waste Separation Facility

Home Our Projects Structural Design – Waste Separation Facility Structural Design – Waste Separation Facility Client Demast Location Sydney Project budget Confidential Project duration 3 Weeks Demast, a waste recovery operator, appointed Realise Engineering to design the layout and structural components of a new building waste separation area. The new facility needed to complement existing […]
3D Scan and As-Built Documentation

Home Our Projects 3D Scan and As-Built Documentation 3D Scan and As-Built Documentation Client CSR Location Sydney Project budget N/A Project duration 3 weeks CSR approached Realise Engineering to capture accurate as-built records of their production facility to support future expansion planning. The work required precise 3D scanning and modelling within a tight timeframe. The […]